Project

General

Profile

Bug #2564

Result Summary Different For Jobs With Different Numbers of Nodes

Added by Dan Whitehouse 5 months ago.

Status:
New
Priority:
Normal
Assignee:
-
Category:
-
Target version:
-
Affected version - extra info:
Affected version:
Difficulty:
uncategorized
Close

Description

I've been running some benchmarks using MPI and I have noticed that when the jobs complete the summary is displayed in a different way depending on how many nodes I use.
For a two node job:

               Core t (s)   Wall t (s)        (%)
       Time:   151386.697     3153.890     4800.0
                         52:33
                 (ns/day)    (hour/ns)
Performance:        0.044      546.867
Finished mdrun on rank 0 Thu Jun  7 15:12:51 2018

And for a 256 node job:

               Core t (s)   Wall t (s)        (%)
       Time:   960396.768      156.315   614400.0
                 (ns/day)    (hour/ns)
Performance:        0.885       27.104
Finished mdrun on rank 0 Wed Nov 15 06:26:15 2017

What is the significance of the "52:33" which is displayed for the 2 node job and not the 256 node job?

Also available in: Atom PDF